A framing contractor specializes in constructing the core structural framework of buildings, creating the essential skeleton that supports all other components. These professionals assemble wood or metal frames for walls, floors & roofs according to architectural blueprints.
Critical responsibilities of framing contractors include:
Framework Components | Primary Materials |
---|---|
Walls | Wood or Metal |
Floors | Wood or Metal |
Roof | Wood or Metal |
Support Beams | Steel or Timber |
Framing contractors work at various stages to establish the building's fundamental structure. They coordinate with multiple construction professionals to maintain proper alignment, structural integrity & design specifications throughout the project.
Framing contractors charge between $7 and $16 per square foot for standard residential projects, including labor and materials. A garage addition costs $4 to $5 per square foot, while complex two-story homes or structures with multiple roof lines range from $10 to $19 per square foot.
Labor expenses for framing projects comprise $4 to $13 per square foot of the total cost. Here's a breakdown of typical labor costs:
Project Size (Square Feet) | Labor Cost Range |
---|---|
1,600 - 3,000 | $10,000 - $25,000 |
Per Square Foot | $6 - $8 (average) |
Wood framing materials range from $3 to $6 per square foot, contributing to the overall project cost. This pricing includes:
Project Type | Cost Range (per sq ft) | Labor Cost (per sq ft) | Material Cost (per sq ft) |
---|---|---|---|
Full House | $7-$16 | $4-$10 | $3-$6 |
Home Additions | $6-$10 | $3-$6 | $3-$4 |
Interior Walls | $7-$12 | $4-$8 | $3-$4 |
Garage | $4-$5 | $2-$3 | $2-$3 |
Basement | $10-$16 | $6-$10 | $4-$6 |
Roof | $6-$9 | $3-$5 | $3-$4 |
Rough framing establishes the core structural elements of a building through three essential components:
Framing Component | Primary Function | Standard Spacing |
---|---|---|
Wall Studs | Load Support | 16 inches |
Floor Joists | Weight Distribution | 16-24 inches |
Support Beams | Structural Integrity | As specified |
Each component integrates precisely with others to create a solid structural foundation. The framework is an anchor point for additional building elements like insulation, drywall, utilities, doors, windows & exterior finishes.
Properly installing these components creates the essential skeleton supporting all other construction phases. Precise measurements, level surfaces, and square corners during rough framing ensure the proper fit of finish materials.
A 20-foot wall contains 16 studs when using standard 16-inch on-center spacing. This calculation includes the end studs and intermediate supports required for residential construction.
Residential construction uses 16-inch on-center spacing between wall studs. This measurement spans from one stud's center to the adjacent stud's center, creating consistent support points throughout the wall.
The mathematical formula for determining stud count follows these steps:
Wall Component | Measurement |
---|---|
Wall Length | 240 inches |
Stud Spacing | 16 inches |
Space Count | 15 spaces |
Total Studs | 16 studs |
Mechanical rough-ins follow the framing stage of house construction. These installations include three primary systems:
Mechanical System | Installation Timeline | Average Completion Time |
---|---|---|
Plumbing | After framing, before the insulation | 3-5 days |
HVAC | Following plumbing completion | 2-4 days |
Electrical | Concurrent with HVAC | 3-4 days |
Additional rough-in installations include:
Building inspections occur after completing these mechanical rough-ins. Inspectors verify compliance with local building codes for each system before construction proceeds to the next phase.
House framing timelines vary based on square footage, design complexity, and crew expertise.
House Size (sq ft) | Efficient Crew (4 workers) | Standard Crew (6 workers) |
---|---|---|
2,400 - 3,000 | 3 weeks | 6 weeks |
Metal and wood framing each offer distinct advantages in construction projects. Choosing these materials impacts durability, maintenance requirements, and project costs.
Metal framing provides superior resistance to:
Wood framing requires additional considerations:
Material Type | Cost Elements | Price Range (per sq ft) |
---|---|---|
Metal | Labor + Materials | $10 - $18 |
Wood | Labor + Materials | $7 - $16 |
Steel framing costs more upfront than wood but offers reduced maintenance expenses over time. Material selection depends on:
Wood framing delivers natural insulation properties that enhance energy efficiency. Metal framing conducts heat more readily, requiring additional insulation materials to achieve equivalent thermal performance.
Metal framing installation features:
Framing carpenters earn different salaries based on experience level:
Experience Level | Annual Salary | Hourly Rate |
---|---|---|
Entry Level (0-2 years) | $24,612 | $11.83 |
Mid Level (3-6 years) | $40,468 | $18.40 |
Senior Level (7-12 years) | $49,754 | $23.92 |
The average framing center salary ranges from $31,000 to $56,342 annually. Geographic location significantly impacts earnings, with urban areas offering higher compensation. For example, framing carpenters in New York City earn an average hourly rate of $24.31.
A framer's hourly rates average:
These rates reflect standard industry compensation for professional framers who construct structural frameworks for buildings, including walls, floors, and roofs. Experience, location, and project complexity determine the exact pay rate within these ranges.
To identify great service providers, we analyze the industry's largest collection of reviews, license records, and building permits.